Lobby of a hearing aid clinic

Specialty Hearing Clinic & Retail Tenant Upfit

Project Description

Location: Mooresville, NC
Size: 2,500 SF

3TEN Construction completed an interior tenant upfit of an existing 2,500 SF retail space for an American-owned, global hearing aid manufacturer. The space houses a hearing center clinic that provides testing services and hearing aid solutions for individuals with hearing impairments, as well as an adjoining retail area dedicated to a specialized brand of hearing protection and enhancement products featuring automatic suppression of noises over 85 dB.

With individual storefront entrances and branded reception lobbies, these adjoining clinics share common areas, including restrooms, a conference room, an employee break room, and a central lab and triage space. Each clinic offers a distinct ambiance and patient experience, reflecting its primary focus—either reparative or preventative care.

The hearing center emphasizes a welcoming, hospitality-inspired reception area. Its design evokes a restorative and uplifting atmosphere, with soft curves flowing throughout the space to subtly reference sound waves. Warm, rich neutral tones paired with wood accents create a calm and grounding environment. Additional program spaces include an audiometric testing suite, offices, and fitting rooms.

In contrast, the preventative clinic features an energetic and vibrant aesthetic, defined by bold colors, dynamic lines, and materials influenced by the automotive industry. This design is tailored to the brand’s target audience, including law enforcement personnel, hunters, industrial and construction workers, and motorsport professionals.

3TEN’s construction management and self-performing teams completed the installation of new walls, ceilings, flooring, lighting, HVAC, and sprinkler systems. 3TEN was able to expedite the project schedule by getting a head start on demolition and framing activities while working hand-in-hand with the design team and owner to finalize the finish selections.

Athletic Center training floor with weight and cardio exercise machines

Atrium Health Motorsports Athletic Center at Hendrick Motorsports

Project Description

Location: Concord, NC
Architect: Redline Design Group
Size: 35,145 SF

Our team proudly partnered in the construction of the Atrium Health Motorsports Athletic Center, a state-of-the-art performance and wellness facility located on the Hendrick Motorsports campus. Developed in collaboration with Atrium Health, this cutting-edge center is designed to support the health, recovery, and peak performance of elite motorsports professionals.

The project encompassed the delivery of a highly specialized athletic facility integrating advanced sports medicine, rehabilitation, and training environments. Key features include strength and conditioning areas, physical therapy suites, hydrotherapy amenities, recovery lounges, and medical treatment spaces—all constructed with precision to meet the rigorous demands of professional racing teams.

Our scope began with an intense demolition leaving only the roof and steel structure followed by structurally retrofitting the building’s foundation to accommodate the needs of its soon to be purpose, a high-performance gym. Through out the required meticulous coordination of structural, mechanical, and interior systems to support both clinical functions and high-performance training. Emphasis was placed on durability, efficiency, and modern design, resulting in a facility that seamlessly blends healthcare innovation with athletic excellence.

This project reflects our commitment to delivering complex, high-performance environments and our ability to collaborate with leading organizations to bring visionary spaces to life.

United Rentals Charlotte

United Rentals (Multiple Projects)

Project Description

Client: United Rentals
Location: Charlotte, NC
Size: 100,000 sf

A 100,000-square-foot renovation for United Rentals Corporate Office included a full interior demolition and complete office upfit. The redesigned space features private offices, open workstations, conference rooms, collaborative ideation areas, break rooms, print/copy rooms, and expanded men’s and women’s restrooms on each floor. A new training center was also added, equipped with motorized operable partitions to create four flexible conference rooms. Additionally, a generator and transfer switch were installed to provide emergency power to the entire facility. A parking lot expansion with an upgraded storm drainage and new paving, creating 274 new parking spaces.

300 Rampart

Rampart Building Adaptive Re-use

Project Description

Client: Colliers International
Location: Charlotte, NC

The project involved renovating an existing masonry building to create a shell space for future offices. Work included adding new perimeter storefront openings, a redesigned entry, upgraded stairs, an ADA-compliant ramp, and an updated electrical system to meet code requirements. Additional improvements featured new lighting, signage, and the relocation of sanitary and water lines for future restrooms. The existing steel truss roof with wooden joists and decking were upgraded with a new membrane and insulation. The space remains conditioned, with no changes to the energy code.

Freedom House Church

Freedom House Church

Project Description

Client: Freedom House Church
Location: Charlotte, NC
Size: 12,500 sf

The Freedom House Southend Campus involved the full renovation of a 12,500-square-foot industrial mill built in 1945. Situated between South Boulevard and South Tryon Street, the campus includes a 400-seat auditorium, youth classrooms, a mezzanine, a café/coffee bar, and a bookstore. The project also featured a complete upgrade of mechanical, electrical, and plumbing systems.

henrickcars.com

HendrickCars.com

Project Description

Client: Hendrick Automotive
Location: Charlotte, NC

Project included renovations of existing General Motors Dealerships for Hendrick Automotive Group, contract included all building renovations. This program was designed by GM to renovate existing facilities to bring up to current GM Brand Standards.

sentara

Sentara Data Center

Project Description

Client: Sentara
Location: Virginia Beach, VA
Size: 46,776 sf

The Sentara data center renovation consisted of the demolition and construction in a former hospital converted to a robust outpatient campus and IT office space. The work was conducted adjacent to a free-standing 24-hour emergency department. The project included complete interior demolition to remove 100% of abandoned electrical, HVAC, and plumbing systems, and build-back of approximately 24,000 square feet, including 8,776 square feet of Data Center space. The Data Center consists of two, 2MW generators with supporting diesel fuel tanks, three air-cooled chillers feeding 10 CRAC units, and approximately 14,000 square feet of raised access flooring.

Symmetry-thumb

Symmetry Financial Group Office

Project Description

Client: Symmetry Financial Group
Location: Swannanoa, NC
Size: 7,000 sf

This Design/Build phased project between two existing buildings. The first phase consisted of a Historical Restoration and Renovation of a 1929, two-story 7,000-square-foot building that previously housed Native Kitchen and Social Pub and the second phase consisted of a renovation/addition to an existing 5,000-square-foot office building with 1,000-square-foot addition. Scope of the project included a new roof, windows, envelope point up, structural repairs, wood deck and an office renovation.

WNCBridgeFoundation_thumb

WNC Bridge Foundation

Project Description

Client: WNC Bridge Foundation
Location: Asheville, NC
Size: 15,000 sf

New two-story, 15,000 sf office building and conference center for the non-profit WNC Bridge Foundation. This beautiful facility includes a combination of steel and exposed timber/glu-lam’s for structure, as well as stone, vertical siding and glazing for the veneer and an extensive outdoor garden area, all to create a warm and inviting space.

City Chevrolet

City Chevrolet

Project Description

Client: City Chevrolet
Location: Charlotte, NC
Size: 40,000 sf

The construction of City Chevrolet consisted of Showroom, office area, and Service & Parts Facilities. Work was completed while the dealership remained open for business, requiring daily coordination with store personnel to maintain customer flow and satisfaction, without disrupting service and operations. Temporary barricades were constructed around the project for safety while all of the renovation work was completed.